вторник, 4 декабря 2012 г.

Tuesday, the 4th of December


04.12.2012


- Quite interesting, yet extremely bad timed task: I was supposed to show somehow (graphically, less words - better) on the brochure the consequence of actions performed by our engineers. Firstly they created thousands of designs, then gave these designs to the calculating program, then the calculating program selected five most suitable of them, and then our engineers tested these five variants very carefully and precisely to find the best one of them. I tried to avoid pointing and directional arrows as much as i could. In my stylish and complex design they would look out of place. So, after some thinking and experimenting, I decided to create a tube-like shape, that would be connected to the points of the bottom list like if they were water pump nozzles. Like if the these tasks "flow" through the bulletpoints in the list and then formed consequence of containers of blue color containing illustrations and comments to the actions performed. I was rather enthusiastic about the idea, but its incarnation, due to a lack of time and effort, did not satisfy me. Anyway, my boss found this variant too "crowded" and it was rejected anyway. I'll save these design concept for better times.

Комментариев нет:

Отправить комментарий